C2AE provided design and construction engineering services for the reconstruction of East Webb Drive, from South Bridge Street to the east City Limits. Improvements consisted of two 12-foot wide lanes plus five-foot wide bicycle lanes on each side with concrete curb and gutter. Additionally, five-foot wide concrete sidewalks for pedestrian use were constructed on each side of the roadway. Storm sewers were constructed from the Prairie Creek-Gunderman Lake Drain to facilitate the entire project.
A portion (2,350 feet) of the 3,150 foot reconstruction project was funded with an MDOT Surface Transportation Program grant.