Create ahead.
We are an engineering and architecture design firm with nearly 60 years of experience.
Together, we are planning, designing, and delivering a promising future. We go beyond solving today’s challenges to envision the world to come—always in service of passion for our craft.
-
Portage Central Athletic Fields
Portage, Michigan
-
John D. Dingell VA Medical Center Emergency Department
Detroit, Michigan
-
Wastewater Treatment Plant
Tupper Lake, New York
-
Cosma Castings
Battle Creek, Michigan
-
Water System Upgrades
Bessemer, Michigan
-
Everett High School
Lansing, Michigan
-
Ferris Coffee & Nut Headquarters
Grand Rapids, Michigan
-
Railroad Square
Kalkaska, Michigan
-
I-96 Improvements
Grand Rapids, Michigan
-
Michigan State University Center for Immersive Media Studies
East Lansing, Michigan
-
New List Item
Description goes here
Since our founding in 1966, we have grown into a trusted name in design.
And though we are proud of our accomplishments, we haven’t lost our small business feel. In fact, 90 percent of our work still comes from repeat clients. We listen, we study, we embrace, and we create. As a result, our designs are loved on day one and appreciated even more over time and use.
Here are a few creative ways to blend contemporary updates with the charm of a historic structure.
Incorporate these 5 design trends into your office environment to support employee recruitment and retention.
Prepare for a project interview with this comprehensive list of questions to ask an architect or engineer.
Building design tips to attract and retain the next generation of employees in the manufacturing industry.
Well-designed Montessori learning environments support hands-on learning for all ages.
Practical strategies to enhance manufacturing plant environments and boost the employee experience without costly investments.
Modernize your town hall with flexible, modular, durable, and sustainable designs that adapt to changing work environments and community needs.
Not all surveys provide reliable feedback; their effectiveness depends on how well they're crafted and distributed.
Master plans often end up sitting on a shelf. By marrying your plan with GIS, you can make it more dynamic, sustainable, and reliable.
If you’re a library director wondering whether your library will stand the test of time, here is an overview of the design features that can serve as a litmus test.
C2AE and Clarkson University are building a GIS database, beginning with the school’s four-story Center for Advanced Materials and Processing (CAMP) building.
C2AE has been a part of the downtown Gaylord community for many years. This March, C2AE is excited to begin a new chapter in a different office. The space is located at 814 South Otsego Avenue Suite B Gaylord, MI 49735.